Construction Punch List Template

Walk the job with the owner and list every item to fix. Group them by room, assign who will handle each one and tick them off as they are done. Progress updates instantly and the sheet prints with sign-off lines.

  • Free, no sign-up
  • Working shown
  • Printable result
  • Reviewed October 2, 2026

Punch list

Your business detailstyped once, remembered on this device for every document

Many states require it on estimates and contracts.

Printed under the contractor signature. Remembered on this device.

Items

Item 1
Item 2
Item 3
Item 4
Item 5
Item 6
Item 7
Item 8
Adjust assumptionswaste, sizes and densities you can change

Untick to leave the printed-name lines blank for writing by hand.

Your result

Add an item to start the punch list.

How to run a punch list

  1. Walk the job room by room with the owner, and add every item with its room.
  2. Assign each item to a person or trade.
  3. Change the status to Done as items are finished. Progress by room updates instantly.
  4. Print the sign-off sheet when every item is done, and walk it again with the owner.

How progress is calculated

Percent complete = items done ÷ total items × 100

By room = items done in that room ÷ items in that room

Worked example

A remodel with 18 punch items, 11 finished

  1. 11 ÷ 18 = 0.611, so the list is 61.1% complete.
  2. 7 items are still open; the open list shows who each one is waiting on.

Typical punch list items

AreaCommon items
Paint and drywallTouch-ups, nail pops, cut-in lines, outlet cover marks
Doors and cabinetsSticking doors, misaligned hinges, missing bumpers or pulls
Tile and countersGrout gaps, caulk joints, chipped edges
FixturesLoose handles, drips, missing towel bars or covers
GeneralFinal clean, debris removal, protective film left on

Common mistakes to avoid

  • Unassigned items. Everything on the list needs a name next to it.
  • Vague items. "Fix paint" is not enough; say where and what.
  • Adding new work. New requests are change orders, not punch items.

Frequently asked questions

What is a punch list?

A punch list is the list of small items still to finish or fix at the end of a job: paint touch-ups, adjustments, missing hardware, cleaning. The contractor completes them and the owner signs off.

When do you make a punch list?

Near the end of the job, during a walk-through with the owner or their representative. Many contractors do their own walk-through first so the owner's list is short.

How is the percent complete worked out?

Items marked done divided by all items. 11 done out of 18 is 61.1% complete.

Who should be on each item?

Name the person or trade responsible for every item. Unassigned items are the ones that never get done, so the calculator warns you about them.

Does a finished punch list mean final payment?

Often, but it depends on your contract. Many contracts tie final payment or release of retainage to completing the punch list.