Sandbag Calculator: How Many Sandbags and How Much Sand

Enter how long and how high your barrier needs to be. You get the number of sandbags, the sand to fill them in cubic yards and tons, and how wide the base will be, using the U.S. Army Corps of Engineers stacking method.

  • Free, no sign-up
  • Working shown
  • Printable result
  • Reviewed October 29, 2026

Your measurements

Barrier type
ft

Along the ground, end to end.

ft

Expected water depth plus at least 6 in to 1 ft.

Adjust assumptionswaste, sizes and densities you can change
%

For burst bags, gaps and tying into high ground.

cu ft

A 14 × 24 in bag half full holds about 0.4 cu ft.

tons per cu yd

Dry sand is about 1.35. Wet sand can be 1.5 or more.

Add your pricesoptional, for a cost total

Use prices from your local store or quotes. We never fill in a national price as fact.

Your result

Enter the length and height of your barrier to see how many sandbags you need.

How to use the sandbag calculator

  1. Pick the barrier type. A single row works for low water up to about 1 ft. For anything higher, use the pyramid.
  2. Measure the length along the ground. Run it past doors and low spots so the ends tie into higher ground.
  3. Set the height to the water depth you expect, plus at least 6 in to 1 ft of safety margin.
  4. Read the result: the number of bags, the sand to fill them, and the base width so you know how much room the barrier needs.

Sandbag formula

Layers = height in feet × 3 (each half-full bag lies about 4 in thick)

Pyramid bags per foot = layers × (layers + 1) ÷ 2

Single-row bags per foot = layers

Total bags = bags per foot × length + extra

Sand (cu yd) = bags × 0.4 cu ft ÷ 27

This follows the U.S. Army Corps of Engineers sandbagging guidance, where one half-full 14 × 24 in bag covers about 1 ft of length and the bottom row of a pyramid has as many bags across as there are layers.

Worked example

A pyramid 20 ft long and 1 ft high

  1. Layers = 1 × 3 = 3, so the bottom row is 3 bags wide.
  2. Bags per foot = 3 + 2 + 1 = 6; for 20 ft, 6 × 20 = 120 bags.
  3. Add 10% extra: 132 bags.
  4. Sand = 132 × 0.4 = 52.8 cu ft = 1.96 cu yd, about 2.6 tons.

Sandbags per 100 feet

HeightLayoutBags per 100 ftSand
1 ftSingle row3004.4 cu yd
1 ftPyramid6008.9 cu yd
2 ftPyramid2,10031 cu yd
3 ftPyramid4,50067 cu yd
4 ftPyramid7,800116 cu yd

Bag counts match the Corps of Engineers table; sand assumes 0.4 cu ft per half-full bag, before extra.

Filling and laying sandbags

  • Fill half to two-thirds full and leave the bag untied. Fold the open end under the bag when you lay it.
  • Use sand if you can. Clay soil and gravel work in an emergency but leak more.
  • Stagger the joints by half a bag on each layer, like brickwork, and tamp each bag in place.
  • Lay plastic sheeting (6 mil or thicker) on the water side and hold it down with a row of bags at the bottom.
  • Work in teams of 2 or 3: one holds the bag, one shovels, one carries.

Common mistakes to avoid

  • Overfilling bags. Full, round bags do not seal against each other and leave gaps.
  • Stacking a single row too high. Above about 1 ft, a single row tips over. Build a pyramid.
  • Stopping short at the ends. Water goes around the barrier. Tie the ends into higher ground.
  • Starting too late. Hundreds of bags take hours to fill. Order sand and bags as soon as a flood warning is issued.

Frequently asked questions

How many sandbags do I need for 100 feet?

Using the Army Corps of Engineers pyramid method: about 600 bags for a 1 ft high barrier, 2,100 for 2 ft, 4,500 for 3 ft and 7,800 for 4 ft. A single row 1 ft high takes about 300 bags.

How many sandbags does a cubic yard of sand fill?

About 67 bags filled half full (0.4 cu ft each). If you fill them heavier, closer to 40 lb each, expect about 60 to 75 bags per yard.

How much does a filled sandbag weigh?

A 14 × 24 in bag filled half full weighs about 35 to 40 lb, a weight most people can lift and pass all day.

How many sandbags to block a door?

A standard 3 ft door needs a barrier about 5 ft long so it runs past the frame on both sides. A single row 1 ft high is 3 layers × 5 ft = 15 bags, plus a few spares.

How wide should a sandbag barrier be?

The Corps of Engineers builds a pyramid with as many bags across the bottom as there are layers, which works out to a base about 2.5 times the height. A 2 ft barrier is about 5 ft wide at the base.